You are browsing as a guest. Sign up (or log in) to start making projects!

Personal Portfolio

  • 4 Devlogs
  • 3 Total hours

My Personal Portfolio And A Template

Open comments for this post

45m 59s logged

Development Log — 02‑07‑2026

Overview

Today’s development session focused on refining the project foundation and establishing a stronger systems engineering baseline for the ASTRA Autonomous Flight System (AAFS).


Completed

  • Completed the Project Administration documentation (EN‑0001 through EN‑0013).
  • Refined the overall project scope and engineering objectives.
  • Removed autonomous powered landing from the baseline project architecture.
  • Updated EN‑0001 – Project Initialization to reflect the revised project vision.
  • Updated EN‑0002 – Development Roadmap to align with the new project scope.
  • Established a formal document revision workflow using Semantic Versioning.
  • Finalized engineering notebook standards, document templates, and repository organization.

Engineering Decisions

Scope Revision

The autonomous powered landing objective has been removed from the baseline ASTRA roadmap.

The project will instead focus on:

  • Autonomous Guidance
  • Navigation
  • Flight Stabilization
  • Telemetry
  • Ground Control Systems
  • State Estimation
  • Recovery System Deployment
  • Mission Analysis

This decision reduces overall project complexity while allowing greater emphasis on developing a robust and modular flight computer platform.


Current Status

Project Phase: Program Foundation
Overall Progress: Administrative Foundation Complete

The engineering framework is now established, allowing development to transition into formal Systems Engineering activities.


Next Steps

  • Begin SYS‑001 – Mission Requirements
  • Define mission objectives and operational concept
  • Develop stakeholder requirements
  • Establish functional requirements
  • Build the initial system architecture

Notes

The project now has a complete administrative framework, including documentation standards, repository standards, requirements traceability, configuration management, verification and validation strategy, and systems engineering management planning.

Future development will focus on transforming mission objectives into traceable engineering requirements.


Ad Astra Per Artem

0
0
0

Delete project?

Are you sure you want to permanently delete this project? This action cannot be undone.

All devlogs, followers, and associated data will be removed.

Followers

Loading…